| Customization: | Available |
|---|---|
| After-sales Service: | 24hours Online |
| Warranty: | 12months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Flat bag vertical packing machine
Its suitable to use in packing the high accuracy and easy fragile material , such as : puffy food , crispy rice , Potato Chips , Snacks , candy , pistachio , sugar , apple slices , dumpling , chocolate , pet food , small wares etc .
*The four sides sealing filling machine is added on the packaging bag based on vertical bag,make the packaging bag have a stronger spatial vision,nice apperance and more attraction.
*PLC control with touch panel-step by step instruction.
* equipped with servo winding system,pneumatic control system.
*use intellectual temperature controller,the high temperature control to ensure neat sealing.
* the perfect automatic alarm safety protection,little waste,the machine will automatically complete all packaging processes from feeding,measuring ,filling,printing,finished bag.
| Items | Content |
| Packing speed | 35bag/min |
| Bag size | front width:80-460mm ,side width:80-200mm
width of side seal:5-10mm,length :100-350mm |
| Bag making mode | doypack type |
| The maximum width of packing film | 520mm |
| Thickness of film | 0.04-0.08mm |
| Air consumption | 200L/min 0.7×105Pa |
| Main power/voltage | 4.5KW/220V 50-60Hz |
| Dimension | 1600×1400×2000mm |
| The weight of switchboard | 900kg |

Q1.When can I get the price ?
A1:We usually offer the quotation within 2-3 work days for equipment and 5-10 work days for system after receiving your inquiry. For urgent offer, please contact with us for special.
Q2.What is the Trade Term?
A2: We accept Ex-work factory , FOB Dalian, CNF or CIF, as your requirement.
Q3.How long is our Production leading time?
A3: It depends on type of equipment.
For cold storage equipment, the lead time is 60-80days after receiving down payment or Letter of credit.
For Spiral Freezer, Tunnel Freezer, the lead time is 80-90days after receiving down payment or Letter of credit.
For flake ice making unit and plate freezer, the lead time is 45days after receiving down payment or letter of credit.